MEP engineering.
Equipment into operation.

Mechanical, electrical and plumbing engineering, industrial utilities and specialist equipment. SEED Systems connects supply and installation with integration, commissioning and support.

The engineering systems division of SEED.

What needs to work?

Industrial facilities

Coordinate the production equipment with the services it depends on.

Thermal systems
Process cooling, ventilation and extraction
Power
Distribution, standby generation and protection
Utilities
Water, compressed air and process piping
Integration
Controls, interlocks and functional testing

Define equipment duty and system interfaces at the start.

Buildings & infrastructure

Bring the building services together as an operating system.

Comfort
HVAC, air distribution and control
Electrical
Power, lighting and standby systems
Life safety
Fire protection, detection and alarm
Monitoring
BMS, ELV and operating sequences

Coordinate design, installation and the handover information.

Specialist equipment

Specify the package, the connections and the route into service.

Selection
Duty, operating conditions and OEM requirements
Installation
Civil, mechanical and electrical interfaces
Acceptance
Integration and commissioning requirements
Support
Training, spares and service scope

Civil aviation and technical facility packages are assessed to the specific requirement.

Engineered as a whole.Defined scope. Coordinated interfaces. Documented handover.

From the plant room
to the production floor.

A building service, a process utility and a specialist equipment package rarely operate in isolation. Their interfaces decide how the facility performs.

Our scope joins engineering with delivery: understanding the requirement, selecting the equipment, coordinating the installation and bringing the connected systems into service.

How delivery is structured

Supply is a stage.
Operation is the objective.

Define the equipment together with the power, cooling, water, controls and access it needs. Agree the acceptance criteria and support scope before it reaches site.

The equipment delivery sequence
  1. 01

    Understand & select

    Duty, conditions, interfaces and equipment requirements.

  2. 02

    Supply & install

    Procurement, receiving, coordinated installation and inspection.

  3. 03

    Integrate & commission

    Controls, functional tests and agreed acceptance.

  4. 04

    Handover & support

    Records, training, maintenance requirements and service scope.

Built on SEED's engineering platform.

Systems operates through SEED, with parent-held engineering registration and management-system certifications.

PEC 861 (CA)ISO 9001:2015ISO 14001:2015ISO 45001:2018
Review holder, scope and validity

Start with the operating requirement.

Tell us what the facility or equipment needs to do. We can then define the engineering, supply and delivery scope.

Discuss your scope